CLCJAWA Phase 2 Water Treatment Plant and Pump Station |
|
| |
|
| Location: |
Lake Bluff, Illinois |
| Contract Value: |
$27,287,716 |
| Owner: |
Central Lake County Joint Action Water Agency |
| Architect: |
Camp Dresser & McKee, Inc. |
| Delivery Method |
Design-Bid-Build |
| Description: |
A large addition to the water treatment plant for the Central Lake County Joint Action Water Agency. The project includes a new residual solids processing facility, upgrade of finished water pumps, and the addition of three new gas generators for electric "peak-shaving" ability. Since the location of the excavation was near a pond, metal sheeting was installed to protect the pond during construction. |