Gilberts Water and Wastewater Treatment Plants
|
|
> Generators
|
| |
|
| Location: |
Gilberts, IL |
| Contract Value: |
$13,000,000 |
| Completion Date: |
2003 |
| Owner: |
The Village of Gilberts, IL |
| Engineer: |
Lintech Engineering LLC |
| Delivery Method |
Design-Build |
| Description: |
Developer Ryland Homes and the Village
of Gilberts chose the design-build format for their infrastructure
improvements for the advantages of shorter project schedules and
cost-effectiveness, while maintaining a high quality project.
The project consisted of two new deep wells, each pumping 1,000
gallons per minute (gpm), a 750,000 gallon elevated water storage
tank, a 1.5 million gallons per day (MGD) water treatment facility
with a barium and hydrogen sulfide removal system, and one MGD
wastewater treatment facility.