Main Pumping Station East Reservoir Addition |
|
| |
|
| Location: |
Orland Park, Illinois |
| Contract Value: |
$8,976,840 |
| Owner: |
Village of Orland Park |
| Architect: |
Greeley & Hansen, LLC |
| Delivery Method |
Design-Bid-Build |
| Description: |
The Main Pumping Station for water distribution in the Village was originally constructed in 1985. The original station was built with a 4.8 million gallon reservoir to hold the potable water for pumping to the residential and commercial areas. The original design included long-range plans to expand the reservoirs as the Village grew. The first addition to the reservoir on the west side added 9.3 million gallons. The construction of this addition to the reservoir on the east side will add 7.4 million gallons to the storage area for a total of 21.5 million gallons. The East Reservoir addition had 50,000 cu.yd. of haul off, 10,000 cu.yd. cast-in-place concrete, and was situated immediately outside the Main Pump Station and Reservoir with neighbors to the east and the School District 135 (Liberty School) just a short distance to the north. |
‹— Back to previous page
|
|